TSMC approves $40.9B more capacity and up to $1B in OpenAI and Anthropic stakes
TSMC's November board added $40.9B in capital spending and up to $1B in AI-lab equity, as the foundry says AI demand still exceeds its supply.
Key figures
- $40.9B
- Capital appropriation approved Nov 10
- ~44%
- 2026 USD revenue growth guide
- 66.4%
- Q3 2026 gross margin
On November 10, TSMC's board did two things that, read together, sum up the state of the AI hardware cycle. It approved about US$40.9 billion in fresh capital appropriations to expand capacity, and it authorised the company to buy up to US$500 million of OpenAI preferred stock and up to US$500 million of Anthropic common shares at the price of any initial public offering. The world's dominant AI-chip foundry is not only building for the labs; it now wants a direct claim on their upside.
What happened
The board meeting followed a run of numbers that would be remarkable for a company a fraction of TSMC's size. October revenue was about NT$586.9 billion, up 59.7% from a year earlier, taking January–October sales to NT$4.49 trillion, up 43.3%.
| Metric | Q3 2026 actual | Q4 2026 guidance |
|---|---|---|
| Revenue | US$46.7B (+16.2% QoQ) | US$52.3–54.3B |
| Gross margin | 66.4% | 65–67% |
| Operating margin | 58.7% | 56.5–58.5% |
| HPC share of revenue | 68% (+22% QoQ) | — |
| 2nm / 3nm share of wafer revenue | 8% / 33% | — |
Third-quarter revenue beat the top of TSMC's own range, and the Q4 midpoint implies 58% year-on-year growth. On the October 15 earnings call, Chairman and CEO C.C. Wei raised the full-year outlook to around 44% growth in dollar terms and kept 2026 capex at US$60–64 billion, with spending from 2026 to 2028 expected to be significantly higher than in the previous three years. The newly approved appropriations, which cover advanced-node and packaging capacity, fab construction and 2027 R&D capital, are the next tranche of that plan.
The capacity map
Wei described nearly 20 fabs in progress worldwide: 13 leading-edge and advanced-packaging fabs in Taiwan over the next several years and five to six overseas. Key milestones he gave:
- N2 entered volume production in late 2025, and N2-family capacity is expected to more than double in 2027.
- A14 risk production is on track for 2027, with volume production in 2028.
- Three new 3nm fabs: a new Tainan Science Park fab in the first half of 2027, a further Tainan fab in the first half of 2028, and Arizona's second fab, now slated for volume production in the third quarter of 2027, slightly ahead of plan. Japan's second fab is set to run 3nm from 2028.
- TSMC is evaluating Texas as a second US site and is in discussions about a customer's proposed "Terafab"; Wei stressed that any such fab "got to be run by TSMC."
Asked whether the AI accelerator revenue target, previously a compound annual growth rate in the mid-to-high 50s percent from 2024 to 2029, still held, Wei said demand showed no sign of slowing and that the figure "probably will be higher." He added that TSMC now sends its own teams to check US data-centre progress and power supply, an unusual step that shows how seriously the foundry takes overbuild risk.
Why it matters for Taiwan's supply chain
TSMC's numbers set the pace for the island's AI hardware ecosystem, from advanced packaging and substrates to server assemblers. The decision to concentrate 13 of the new leading-edge and packaging fabs at home keeps Taiwan at the centre of AI chip production, even as Arizona and Japan scale up. But it also means Taiwan's exposure to a single end-market is rising: HPC is now 68% of TSMC's revenue, and a meaningful share of that ultimately traces back to a handful of US hyperscalers and labs.
Perspectives
The bull view is that TSMC holds the pricing power the rest of the chain lacks. Gross margin of 66.4% even while ramping a new node is extraordinary for a manufacturer, and Wei's line that TSMC has "no intention to leave food on the table for others" signals it will keep adding capacity rather than ration it. Customers cannot sublet allocations, he noted, which keeps TSMC in control of who gets wafers.
The cautious view focuses on three pressure points. First, dilution: 2nm ramp costs cut 1.3 points from gross margin in Q3, and overseas fabs will dilute margins by about 2% this year and 3–4% in coming years. Second, Wei himself flagged that consumer and price-sensitive markets are being squeezed by rising component prices, and TSMC says it is being prudent in its business planning for 2027. Third, the equity stakes in OpenAI and Anthropic, while small relative to TSMC's roughly US$126 billion in cash, add the foundry to the list of suppliers financing their own demand, a pattern critics of AI's circular economics watch closely.
What to watch
- Whether the Anthropic share purchase proceeds, since it is tied to an IPO price.
- January guidance for 2027 capex and whether the AI accelerator growth target is formally raised.
- The pace of Texas site evaluation and any Terafab arrangement.
- Monthly revenue in November and December against the Q4 range.
Researched and drafted with AI assistance under editorial review. Report errors to support@aiseeker.dev.
Sources
This report synthesises the sources below. Primary sources are marked.
- [1]TSMC Board of Directors Meeting Resolutions
TSMC2026.11.10Primary
- [2]TSMC October 2026 Revenue Report
TSMC2026.11.10Primary
- [3]TSMC Reports Third Quarter EPS of NT$29.43
TSMC2026.10.15Primary
- [4]Q3 2026 Taiwan Semiconductor Manufacturing Company Limited Earnings Call (edited transcript, LSEG StreetEvents)
TSMC Investor Relations2026.10.15Primary